Hardwood Floors August/September 2017

By Jason Elquest

that is especially desirable when working on historical floors. Whether the board replacement is happening on a nailed floor, a glued floor, or a floated floor, the process may be similar and will be a specialized skill that will enhance your business. You can learn more about board replacement techniques from the NWFA’s Installation Guidelines, by attending NWFA training events, and by engaging with NWFA University. For more information, contact the NWFA at 800-422-4556 or visit NWFA.org. Jason Elquest is owner of Scottsdale, Arizona-based Blackhawk Floors Inc. and is an NWFA Regional Instructor. He can be reached at jason@blackhawkfloors.com.

Apply a quick-setting adhesive, such as epoxy or carpenter’s wood glue, to the tongues of the adjoining boards. For glue down floors, replace the glue on the subfloor as was previously existing, same trowel notch and spread rate. Carefully

insert the new board into place, using a wood block and mallet if necessary. Clean the entire area surrounding the repaired board and ensure the repair is complete. Board replacement is a valuable service

the magazine of the national wood flooring association

59

Made with FlippingBook flipbook maker