2019-2020 Purchasing Guide Volume 1

$8

Tape, Duct

ROLL

$9

Tape, Painters, blue

ROLL

All consumables will be charged at the above rate and marked up 20%. All consumables that are not scheduled will be charged at cost plus a 20% markup.

Other Services and Reimbursements

IV.

All work performed by tradesmen or subcontractors that is not listed in this schedule or in a separate unit cost estimate will be marked up 20% above list price.

B. Freight / Transporation:

RestoreCore shall be compensated for costs incurred for transporting equipment and materials to and from the work site. Transportation will be billed at cost plus 20%.

C. CAT charges:

During area-wide catastrophe situations, a 6% surcharge will be added to each invoice. This fee covers indirect expenses incurred during a CAT response.

D. Taxes and Permits:

Taxes, permits, local use and mercantile taxes, state sales taxes and other fees assoicated with the performance of the project are not included in fees assoicated with this agreement. RestoreCore shall

Made with FlippingBook Annual report